[Bay-IBI Group Architects]
[Bay Architects] [Bay Architects] [Bay Architects]

Alief Hastings High School


[43a]

Client: Alief ISD
Completion Date: 2000
Construction Cost: $3,199,157
Services: Planning, Design, Construction Administration


The additions to Alief-Hastings High School were designed to consolidate the administration area near the entrance to the school and provide an "identifiable" front door while also acting as a security portal to the entrance of this sprawling campus. A unification of the north and south houses was achieved with the addition of a curved colonnade which also acted as the new façade for the band hall addition. The introduction of a glass topped entry tower created a new identity for the campus.

The relocation of the administration area provides additional safety benefits by allowing the main office to visually control the student and bus drop-off and the visitor entrance.


URL: http://www.bayarchitects.com/projects/43.aspx
Copyright © 2012 IBI Group Inc. (http://www.ibigroup.com/), Bay-IBI Group Architects (http://www.bayarchitects.com/). All rights reserved.