[Bay-IBI Group Architects]
[Bay Architects] [Bay Architects] [Bay Architects]

Pearl Hall Elementary School


[243a]

Client: Pasadena ISD
Completion Date: 2007
Construction Cost: $13,971,000
Services: Planning, Design, Construction Administration


The campus design is programmed to house an optimum capacity of 800 students. The library is the central focus of the facility, while the administrative area is strategically located in the front of the school to control the site entrance. The noisy spaces such as P.E., cafeteria, and music classrooms are located on one side of the building, while the academic classrooms are grouped in a pod design with separate common spaces for kindergarten, first, second, third, and fourth grades.


URL: http://www.bayarchitects.com/projects/243.aspx
Copyright © 2012 IBI Group Inc. (http://www.ibigroup.com/), Bay-IBI Group Architects (http://www.bayarchitects.com/). All rights reserved.